Can a survey be built so that the person taking the survey can change the order of the questions?

0

We are currently using Survey Gizmo as a quality receiving log for inbound food items. Receiver enters PO number, arrival time of the delivery and then answers a couple of questions about each product that was received. Trucks are received at each facility with only the items that were ordered and in varying locations on the truck with each delivery. Is there a way to write the survey whereby the receiver (person filling out the survey) has the ability to choose the next product being taken off the truck from a pull down menu?

Dominic Sharpe answered
    0

    I’m not sure if this works for your set up but one option could be to have a Checkbox (multi-select) as the first question. The receiver can use this question to select all the ordered products.

    Then, you could use Question Repeating to repeat the same set of questions for each selected product in the previous checkbox question:

    https://help.surveygizmo.com/help/question-repeating

    Using this method, questions would be created dynamically for each product.

    Hope this helps!

    Dominic Sharpe answered
      ×

      Login

      Question stats

      • Active
      • Views1321 times
      • Answers1 answer
      • Followers1 follower